Terms of Service for GridWorks Supply
These terms describe the sourcing coordination offered by GridWorks Supply to business buyers. They do not describe a module factory, an installation contract, or a utility interconnection agreement. If you use the site or send an inquiry, you are asking for help gathering and comparing factory quotations. You are not placing a purchase order.
What the service covers
GridWorks Supply reads the equipment type, application, rated power or capacity, electrical interface, quantity, US destination, timing, and document requests you submit. A coordinator may contact factories and line up replies on specification, quantity, delivered scope, and supplier documents. The work is independent sourcing support. It is not engineering design, not a safety listing, and not a promise that a named plant will accept the order.
What you still decide
You choose the module, the architecture, and the award. Structural checks, rapid-shutdown choices, string current against fuse ratings, and the inverter MPPT window stay with qualified people on your project. Maximum system voltage, whether 1000 V or 1500 V, is taken from the quoted datasheet when that datasheet exists. GridWorks Supply does not replace the authority having jurisdiction.
Quotations and money
Factory numbers, if a plant sends them, belong to that plant. Compare currency, per-module or whole-order basis, freight, duties, accessories, warranty, and exclusions before you treat two prices as the same scope. An optional budget and a supplier preference (high-end, mid-range, budget, or undecided) are buyer instructions. They are not audited ratings. The header note about FREE sourcing support and up to 3% follows the eligibility sentence shown there. It is not a fixed price cut.
Information you send
Do not send secrets you are not allowed to share. Drawings can be described in the form and exchanged after the first reply. There is no file-upload control. Inquiry text is used to coordinate quotations and to reply to you. The privacy policy explains that handling in more detail.
Site content
Pages, including the equipment planner and the buyer notes, are general questions. They are not a bid set. Product labels in the catalog are inquiry names. Empty image fields mean a picture has not been attached. They do not mean a module is unavailable or available. Published articles may link to public educational pages. Those links are references for field names, not endorsements of a supplier.
Limits
The site is provided as a coordination desk. GridWorks Supply is not liable for a factory’s late reply, a datasheet error, a freight exception, or a project decision you or your engineer make from the materials you receive. Where a limit is not allowed by law, the limit applies only to the extent the law permits. Questions about these terms can be sent through the contact form with the subject line “terms”.