1. Format
Ask for cell technology, dimensions, and frame holes. A 72-cell or 144 half-cell label is a format question, not proof the rail will fit.
Question list for a buyer
A solar panel distributor conversation goes better when the blanks are labeled. GridWorks Supply uses this planner as a question path, not as a design tool and not as a stock screen. You remain the buyer. This desk coordinates as an independent sourcing partner.
Ask for cell technology, dimensions, and frame holes. A 72-cell or 144 half-cell label is a format question, not proof the rail will fit.
Record rated power in W at STC: 1000 W/m² irradiance, 25 °C cell temperature and the AM1.5 reference spectrum. Add maximum power voltage and open-circuit voltage in V, current in A, efficiency with its test basis and operating temperature in °C. Keep any requested values separate from the proposed model's documented ratings.
Ask for connector manufacturer, exact type, cable size and lead length in mm. Require the intended mating pair and its instructions; a “compatible” label or matching shape is insufficient. Leave pair approval with the qualified project reviewer.
Mounting method, design wind or snow values the structure vendor already uses, and the frame the drawing shows. Enclosure rating applies to related boxes, not to the glass face by default.
Datasheet, drawing, test sample, and any listing must name the manufacturer and model. Agree a review method before sampling: check labels, dimensions, connector markings and lot-linked flash or electroluminescence records against the agreed revision. Log differences and an acceptance decision. Request MOQ, sample cost, freight and preparation time separately; no sample outcome is promised.
Unit price versus a matched delivered scope: the unit-price column can shrink the module line when accessories and freight truly match. The scope column can show that a crate still needs a different connector, a different pallet height, or papers your inspector named. Keep both columns. Do not collapse them into a percent-off claim.
String or central conversion versus module-level electronics: fewer power converters can suit a clear field. Per-module electronics can suit shade and monitoring the design already paid for. Neither choice is made on this page. DC-to-AC ratio stays with the engineer who owns the one-line.
If storage shares the project, write AC-coupled or DC-coupled as the current design assumption, or write that it is unresolved. AC-coupled gear can stand beside an existing PV inverter. DC-coupled gear can share a DC bus on a new build when that bus exists. Battery transport files, when storage is quoted, are requested for the exact battery, not assumed from the module pack.
Supplier preference is yours: high-end, mid-range, budget, or undecided. It records how much documentation and commercial posture you want. It is not a grade we have audited. Move from here to the labels, the quote fields, or the form. The brief article carries the same questions in long form.
Reference checks made 26 October 2026: NREL photovoltaic monitoring guidance explains STC, and Stäubli's connector pairing guidance explains why a compatibility label alone does not establish the mating pair. Neither reference approves the proposed module or makes this service an authorized representative.
Send the filled cells, including blanks you refused to guess. FREE sourcing support and an up to 3% ceiling are described in the header, with the eligibility review.
FREE sourcing support
Qualified sourcing support is subject to an up to 3% ceiling and review of the procurement scope.
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.